The following configuration guidelines apply for upgrading, adding, or removing a VC node:
When upgrading an IMM-only node to a CPM-IMM node, ensure connectivity is available between the IMM and the current active CPM-IMM node over the stacking links.
A power cycle may be required if the role is changed from a CPM-IMM node to an IMM-only node.