The detection of an MDA removal or an MDA failure can take additional time. This can affect the APS switchover time upon the removal or failure of a protection MDA. If the removal is scheduled during maintenance, it is recommended that the port and, or protect circuit be shutdown first to initiate an APS switchover before the MDA maintenance is performed.