CPM switchover

During a switchover, system control and routing protocol execution are transferred from the active to the standby CPM.

An automatic switchover may occur under the following conditions:

A manual switchover can occur if a switchover is forced from an active CPM to a standby, then use the admin redundancy force-switchover command. Configure a batch file that executes after failover by using the config system switchover-exec CLI command.